Saturday, April 27, 2019

Storm Drainage Design Project and Flooding Assignment

Storm Drainage Design Project and swamp - Assignment ExampleSurface streams and groundwater flows and the wetness of soil before a the storm be the factors to be considered. accord to Dr Tim Stott, pelting prediction is a matter of statistics. No one can predict what the rainfall and catchment conditions provide be in the future. With climate change, past records are not reliable for future references. Engineering shape ordain be based on specified probability storm and the runoff generated by catchmentsIn the hydrographs of Cynon River, there was an almost steady flow of water in the river for the first 40 hours. As the crest of water start to rise on the 42nd hour, water had a abrupt rise and on the 44th hour the water temporarily had a constant flow and began rising again on the 48th hour. The rise was constantly rising until it reached the peak flow and it was recorded to be 0.65m above the river nates and the rainfall recorded at 1.2mm. In the analyses of the river hydro graph, the rise of water is faster than when it starts to subside. It would take more while to subside, and having a steady downward motion. There are factors that control the shape of hydrographs. The typical shape are shown and the main components are labeled according to Weyman (1975). A hydrograph would show the difference between the peak rainfall from the peak discharge. This is known as the lag time. Then a lag time is greater, there is slight chance of cloudbursting whereas a short lag time leave show that water had reached the river railway line quickly. The rise in discharge or rainfall as shown in the graph is called the rising offshoot and the decrease in rainfall is the falling limb.There are several factors that affect a flood hydrograph. Areas with large basins receive more precipitation that the small ones and they have a larger run-off(Hoyt, 1936) Larger basins will have a longer lag time as water has a longer exceed to travel before it can reach the river tr unk. According to Gillesania, 2006, the shape of the basin which is typically elongated, would produce a lower peak flow and longer lag time than a circular one. The effect of the tip is also very important. The flow will be faster down a steep slope, hence producing a steeper rising limb and shorter lag time.Channel design Given Data transmission line Given the discharge in the channel, apply the the Manning Q = 1.5 m3/s formula to get a suitable width b, of a channel with n =0.019 depth dS= 1/2500 = 0.0004d= 0.6Formula to be used V=where v = velocityQ=AvR=Hydraulic RadiusQ=AS=slopeA=bdn=Mannings coefficientR= Q=dischargeComputationsA=db=0.6(b)Q=AR= 1.5=0.6b1.5(0.019) = 0.6b0.0285 = 0.6b= 0.61.425 =0.6=2.375=(2.375)3 = b313.3964= 13.3964 = 13.3964(1.44 + 2.4b + b2) = 0.36b519.2908 + 32.1513b + 13.3964b2 = 0.36b519.2908 + 32.1513b + 13.3964b2 - 0.36b5 = 0 b = 3.9798 m. The discharge flow of the river is also to be computed. The computation is necessary because a comparison will h ave to be made in order to determine

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.